Lumida
PPL Corp

PPL Corp

PPL
$35.38USD↑+0.63%+0.22 today

MARKET CAP

26.6B

P/E (TTM)

21.6x

FWD P/E

—

DAY RANGE

$35 – $36

52W RANGE

$32
$40

AI Summary

Stalk
Buy NowMedium

PPL is in a Stage 1 basing/accumulation phase following a capitulation low, with active Bullish Pivot Point and Post-Capitulation patterns indicating downside control has failed and upward mean reversion is favored. The medium-term bias is bullish, and short-term timing is favorable as price pulls back into the rising 9/20 EMA cluster while holding above the 50SMA. Execution should favor a pullback interaction near current levels, with constructive confirmation above the 200SMA (~$36.02). A decisive break below the 50SMA would invalidate the bullish posture.

  • ↑PPL plans approximately $5B of 2026 capital investment for grid reliability and growth.
  • ↑Signed data-center agreements total about 32 GW, supporting future load growth.
  • ↓Planned capex of about $23B through 2029 could pressure leverage and financing needs.
Full analysis →

The case for & against

Bull & Bear analysis

Bullish

PPL Corporation (NYSE: PPL) is a major utility provider based in the United States, primarily engaged in the generation, transmission, and distribution of electricity. The company operates in Pennsylvania and Kentucky and focuses on delivering reliable and affordable energy to its customers. PPL is well-positioned to capitalize on growth driven by the rise of data centers and evolving energy demands, with significant investments expected in both infrastructure and sustainable energy solutions.

Bull says

  • ↑PPL plans approximately $5B of 2026 capital investment for grid reliability and growth.
  • ↑Signed data-center agreements total about 32 GW, supporting future load growth.
  • ↑2026 EPS guidance is $1.90-$1.98; Q2 ongoing EPS was $0.33.
  • ↑Pennsylvania approved a $275M rate increase, supporting capital recovery and cash flow.
  • ↑$2.3B deployed year-to-date, 30% above Q1 2025, advances infrastructure upgrades.
  • ↑High earnings and dividend yield factors support income appeal; liquidity appears adequate.

Bear says

  • ↓Planned capex of about $23B through 2029 could pressure leverage and financing needs.
  • ↓A Pennsylvania stay-out agreement prevents base-rate increases until mid-2028.
  • ↓Negative growth and estimate-revision factors signal muted near-term expectations.
  • ↓Rising interest rates could increase borrowing costs and reduce financial flexibility.
  • ↓Supply-chain constraints may cause project delays and capital-cost overruns.
  • ↓NVIDIA energy JV is unlikely to provide material earnings before 2029-30; volatility risk is elevated.

Investment themes with PPL

High Dividend Yield↑ +0.36%

Companies paying above-average dividends

AVGO · JPM · XOM

Earnings Call · Q3 2025 · Mgmt. Guidance

Updated 11-07-2026neutral

Transcript signals

Bull points

  • Today we reported third quarter GAAP earnings of 43 cents per share. Adjusting for special items, third quarter earnings from ongoing operations were 48 cents per share.
  • Building on this strong performance, we've narrowed our 2025 ongoing earnings forecast range to $1.78 to $1.84 per share, maintaining our midpoint of $1.81 per share. We remain confident in our ability to achieve at least this midpoint, supported by our continued operational discipline and strategic execution.
  • Throughout the quarter, we continue to advance our utility of the future strategy, delivering meaningful progress across our operations.

Bear points

  • We recorded special items of 5 cents per share during the third quarter of 2025, primarily due to IT transformation costs and certain costs related to the integration of Rhode Island Energy.
  • I would say in Pennsylvania, the PUC is proposing their large load tariff this week, and I think what we have in our proposed tariff in the rate case, those protections will be in that tariff, and that tariff may go even further than what we have proposed. So overall, I think as long as we have these proper protections in place, not overly concerned about concentration risk. The other broader, I would say, aspect to this is certainly in the early stages, which we are, I don't see these hyperscalers not needing the amount of power that they're signing up for. In fact, they're probably going to need even more.
  • about $30 million of additional O&M, about $40 million of additional CapEx from now until 2030, in addition to what was filed in the base rate case request for Mill Creek II.
Read full transcript analysis ›